Among the most important finalized or still ongoing works we list here:

  • The sea discharge pipes for the wastewater treatment plants Constanta Nord and Eforie Sud - owner: RAJA SA Constanta. This work has been done in partnership with Athena SA, Greece and it consist of montage of the sea discharge pipes of the treated waters at the wastewater treatment plants Constanta Nord şi Eforie Sud. At Constanta Nord have been assembled two pipes that will transport the treated water at 3886 m offshore, and meteoric water at aprox. 490 m offshore. For the water treatment plant Eforie Sud the discharge will be done on a single pipe at aprox. 1500 m offshore.

  • assemblage of the protection fences at the fluvial water cooling instalation at the Nuclear Powerplant in Cernavoda, Romania,


  • refloating of the Plaur tug agrounded in Calarasi zone (Danube river), work done in partnership with Deme Macarale ltd.,

  • assemblage of the support pillars at the Agigea bridge (declogging, formworking, pouring the hydraulic concrete, assembling itself ),

  • 2003 - 2004 cleaning of the bottom inlets at the suction holes at the Deva Hidroelectrical Plant (Deva Mintia dam),


  • 2005 - 2006 - pier and wharf construction in Algiers harbor, Alger (subcontracting for ARAS ltd./Turkey). During this operation have been transported and placed in position a total of 652,000 tons of stone of 0-500 kg / pcs., 120,000 tonnes of stone of 3-6 tonnes/pcs. and 4327 concrete blocks (70 tons each).

  • 2007 - 2008 repairs made to the drivetrain of the SCM Agigea Shipyard sincro-lift.